    The Tahoe National Forest just did some work on Cadillac Hill. They had a Spider Excavator building rolling dips and closed a few short sections of trail.

    A full write up and lots of pictures on my website: www.TheOtherRubicon.com

    I'm sure at some point I will need our membership to send emails and make phone calls.

    I'll keep you informed.

    Just one example...


    Name:  20191126_115404_resized.jpg
Views: 139
Size:  486.1 KB
    Doug Barr - www.TheOtherRubicon.com
    Lake Tahoe Hi-Lo's & No. Tahoe Trail Dusters

  2. #2
    Wheeler
    Join Date
    23 Feb 2013
    Location
    Whites Creek
    Age
    51
    Posts
    342
    Real Name
    Tom
    Thanks for the info

  3. #3
    Web Wheeler
    Join Date
    25 Jan 2010
    Location
    Elko
    Posts
    2,787
    Real Name
    Max
    Thanks for the update Doug. Pretty astonishing.

  4. #4
    I support Reno4x4!
    Join Date
    31 Mar 2005
    Location
    Edge City, NV
    Posts
    10,262
    Quote Originally Posted by Simple Man View Post
    The Tahoe National Forest just did some work on Cadillac Hill. They had a Spider Excavator building rolling dips and closed a few short sections of trail.

    A full write up and lots of pictures on my website: www.TheOtherRubicon.com

    I'm sure at some point I will need our membership to send emails and make phone calls.

    I'll keep you informed.

    Just one example...


    Name:  20191126_115404_resized.jpg
Views: 139
Size:  486.1 KB


    Was that tree broken over with correct permits, dust abatement and EIS report?
    Great spirits have always encountered violent opposition from mediocre minds.

    Albert Einstein


    <a href=http://i2.photobucket.com/albums/y12/RARECJ8/rareCJ8.jpg target=_blank>http://i2.photobucket.com/albums/y12...J8/rareCJ8.jpg</a>
    www.hillsangels4x4.com. Plankowner
    Life Member Blue Ribbon Coalition
    Cal 4 Wheel
    ECV #3691


    Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore

  5. #5
    Wheeler
    Join Date
    20 Feb 2007
    Location
    Wellington
    Posts
    316
    Real Name
    Cary
    What a cluster fuck...

  6. #6
    I support Reno4x4!
    Join Date
    31 Mar 2005
    Location
    Edge City, NV
    Posts
    10,262
    Those areas, meh. What does need attention is between morris rock to the lower big hair pin. Trail is slowly stuffing away. Walk it and look up, the original route is a mere trace that suffered the effects of erosion. This section needs erosion abatement.
    Great spirits have always encountered violent opposition from mediocre minds.

    Albert Einstein


    <a href=http://i2.photobucket.com/albums/y12/RARECJ8/rareCJ8.jpg target=_blank>http://i2.photobucket.com/albums/y12...J8/rareCJ8.jpg</a>
    www.hillsangels4x4.com. Plankowner
    Life Member Blue Ribbon Coalition
    Cal 4 Wheel
    ECV #3691


    Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore

  7. #7
    Web Wheeler
    Join Date
    09 Jan 2008
    Location
    Northern Nevada
    Posts
    3,046
    Real Name
    Will
    Maybe you could explain some of your statements a little. The removal of the rock in the trail leaving a big hole for one. Maybe I am wrong but the work they were doing looks like a precursor to better work. I can understand the issue of not communicating, that is a government thing. What I don’t get is how negative you appear to be when some of the work was good and some is probably needed but you didn’t like the way it was done. Maybe explain a little more about how the loose dirt could have been made better. Maybe show some examples of better work. Perhaps there is an established USFS standard that wasn’t met?

    For all the talk of communicating, you seem to be attacking awfully hard and while I am grateful for your level of engagement I am concerned that being so negative may lead people to the wrong conclusions and undo the MOU progress.
    Some people are as useful as a football bat.

  8. #8
    Wheeler
    Join Date
    10 May 2005
    Location
    Sparks, NV
    Age
    55
    Posts
    208
    Real Name
    Doug
    Basically, the TNF got ahead of themselves. I'm not opposed to this type of work being done but you shouldn't start what you can't finish. They started the project but didn't finish it (before winter storms) by rock lining the bottom of the rolling dip and by hardening and compacting the berm to prevent erosion. If it had all been done at the same time, I'd be good with it.

    Joe was also ready to close sections of side trails that had been in place for almost 40 years, without user input. I was not able to talk him out of closing other much shorter sections of trail. I really didn't like being in the position of being asked to decide what to keep open and what to close. That should never be one person's decision. I was able to get Joe to postpone the closure of certain sections.

    The agencies in charge are in the middle of agreeing and signing an MOU about maintenance and the TNF went ahead without abiding by the rules in the MOU. Part of that was reaching out to and including the other agencies, the users and volunteers about to get their input. That never happened.

    As for a better example, El Dorado County has been doing maintenance on the Rubicon within El Dorado County for years, with their work meeting the scrutiny of the Central Valley Water Authority. Vickie Sanders of El Dorado County drove this MOU. She has been the grant getter and has overseen the maintenance for more than a decade. Joe Chavez left her out of the planning for this project.

    When El Dorado County started in on trail work to get the Clean Up and Abatement order lifted, everyone was worried that they would pave the trail. Pulling a single rock out of the center of the trail could be considered paving. The work at Potato Patch could be considered paving. When El Dorado County was finished, although it's an ongoing process, MOST users understand and agree with the work done and don't consider it paving.

    Joe Chavez and the TNF does not have the experience or skills of OHV trail maintenance that El Dorado County has. The MOU should be rewritten giving El Dorado the lead in trail maintenance across the entire Rubicon.
    Last edited by Simple Man; 2 Weeks Ago at 08:54 PM. Reason: added "the other agencies"
    Doug Barr - www.TheOtherRubicon.com
    Lake Tahoe Hi-Lo's & No. Tahoe Trail Dusters

  9. #9
    Wheeler
    Join Date
    10 May 2005
    Location
    Sparks, NV
    Age
    55
    Posts
    208
    Real Name
    Doug
    A few more examples of better work came to mind. Several years ago, the Lake Tahoe Basin Management Unit did a major rebuild of the Middle Fork Trail up Blackwood Canyon. They used dg and create some HUGE roiling dips. So huge you don't know you're driving over them. It's like the trail is just a series of rollers. Probably not practical for the Rubicon with the heavy equipment and amount of material require but done right.

    The other example is Eldorado NF, not El Dorado County, working on the Richardson Lake Trail up to Sourdough Hill. This was part of the 42 trail closures for that were claimed to be damaging meadows. The Eldorado brought in dg, actually, we the uses brought in dg. The FS brought in a gas powered compactor. We put down some dg, they compacted it. Some water was added to the dg and they compacted it again. This went on slowly building up the berm. We built on at the cabin lower down on the trail and a smaller one much further up the trail before you cross the PCT.

    It is possible to do this work correctly. You just have to want to do it right.
    Doug Barr - www.TheOtherRubicon.com
    Lake Tahoe Hi-Lo's & No. Tahoe Trail Dusters

Similar Threads

  1. Cadillac Hill Closure
    By Posimoto in forum Past Events & Trip Reports
    Replies: 1
    Last Post: September 30th, 2014, 02:00 PM
  2. Cadillac Hill work closure, Oct 11&12 2014
    By bad coco in forum Land Use
    Replies: 0
    Last Post: September 30th, 2014, 08:21 AM
  3. Event FOTR Work Party on Cadillac Hill July 17-20th
    By bad coco in forum Past Events & Trip Reports
    Replies: 2
    Last Post: July 14th, 2014, 02:37 AM
  4. Cadillac Hill Closed 7/20
    By RARECJ8 in forum Land Use
    Replies: 4
    Last Post: July 12th, 2014, 07:52 PM
  5. Cadillac Hill Reception w/HT
    By Rollbar in forum Amateur Radio & CB
    Replies: 8
    Last Post: July 11th, 2012, 08:51 AM

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •